Due to structural timber pole decay, the high ropes linear course was carefully lowered to the ground for safety. This operation was carried out using two cranes and a MEWP (cherry picker), ensuring the structure was safely supported and controlled throughout the lifting and lowering process.
Project type: Repair & Replacement, Traditional High Ropes
Location: Portinscale Keswick Cumbria
Client: Derwent Hill
Highlights
Linear Take Down
MEWP (Cherry Picker) Operation
Get In Touch
For more information or to book a site a site visit.


