Due to structural timber pole decay, we removed and replaced the timber pole with a galvanised and powder-coated green steel column.

The existing pole was excavated, and a reinforced concrete foundation was installed before the steel column was securely fixed using resin anchors. The attached rope course elements were carefully disconnected from the timber pole, and once the new column was installed, they were reattached and adjusted as necessary to ensure correct alignment and safe operation.